Installation Projects
Martin Agency
Our team installed a wireless fiber bridge from building A to building B in downtown Richmond. We installed a network cable from the data room to the roof in each building. The point-to-point radios were installed and calibrated on the roof, allowing a secure high-speed connection for the company in both locations.
Riverside School
NDEC coordinated an install of fiber optic cable from one building on campus to another. Our skilled technicians installed a network rack, data locations, and wireless access points for the building. We also installed a RF wireless bridge from the main building to provide internet access to the gymnasium building.
Better Business Bureau Project
We installed a network solution for the entire office space including voice, data, and Wi-Fi. In addition, we mounted and installed several TVs and designed a multi display system for the conference room.
Sharper Learning at Deep Run High School
We installed new dry erase boards at Deep Run High School, using laser-guided tools to ensure precise alignment. The result is a clean, professional look that enhances the learning environment. This project showcases our focus on accuracy and quality work. Proper placement of the boards supports better visibility and engagement, helping create a more effective space for teaching and learning.
ACE Center at Hermitage
Two Advanced Career Education (ACE) facilities have recently opened at Hermitage and Highland Springs High School, with the capacity to serve up to 1,000 students pursuing careers in technical education. These facilities will offer programs in fields such as auto body repair, veterinary science, cyber security, and physical therapy. The team at NDEC is proud to have contributed to the installation of the first set of ActivPanels at the ACE Center at Hermitage!
Henrico Schools New Construction
Tucker High School and Highland Springs High School
Our team provided a 86” ActivPanel on a mobile stand for each classroom and learning area in both schools. This included unboxing, building the stands, mounting the panels, updating firmware and setting up each new panel before distributing them to their final locations.
Jack & Jill School